Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 79905 REL 8: 1992-026-01 EXP UGR BOWMAN OFF SITE WATER DEVELOPMENT
Project Number:
Title:
Grande Ronde Model Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
79905 REL 8
Contract Title:
1992-026-01 EXP UGR BOWMAN OFF SITE WATER DEVELOPMENT
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
The Bowman Off-Site Water Project is located in the Grande Ronde Sub-basin between RM 153.8 and 155.2.  The project reach is located near the town of Starkey and is within the Grande Ronde recovery plan assessment unit UGR15. The proposed project area is privately owned by the Bowman family, and is currently used for livestock grazing. This reach includes previous restoration actions completed by ODFW, which included the installation of a riparian exclusion fence, boulder, and LWD structure placements.

This project will function as a component of a larger restoration effort, by establishing an off-site water resource for livestock in the upland areas where grazing is actively occurring. In turn this action will limit livestock access to the riparian area, providing valuable opportunity to continue developing the next phase of implementation of restoration activities within this reach of the Grande Ronde River.

A portion of the funding for this project has been covered through a 50 percent cost share with the NRCS through the RCPP program. Project partners include: Oregon Dept of Fish & Wildlife, Grande Ronde Model Watershed, private landowners, and Bonneville Power Administration.
Account Type(s):
Expense
Contract Start Date:
09/01/2020
Contract End Date:
08/31/2021
Current Contract Value:
$64,852
Expenditures:
$64,852

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Grant
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance completed for Bowman Off-site Water Development A: 165. Complete and/or initiate Environmental Permitting for Project Activities 08/31/2021 10/30/2020
Install off-site watering system as designed by the NRCS. B: 34. Install off-site NRCS designed alternative livestock watering system. 08/31/2021 08/31/2021
Install Pasture Division Fence C: 40. Pasture division fence installation 08/31/2021 06/30/2021
Effective implementation management and timely contract administration D: 119. Project/Contract Administration 08/31/2021 08/31/2021
Upload Completion Report E: 132. Upper Grande Ronde Bowman off site water Development Completion Report 08/31/2021 08/31/2021

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 34 Develop Alternative Water Source
  • 1 instance of WE 40 Install Fence
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 34 Develop Alternative Water Source
  • 1 instance of WE 40 Install Fence

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete and/or initiate Environmental Permitting for Project Activities
B 34 Install off-site NRCS designed alternative livestock watering system. 10/01/2020
C 40 Pasture division fence installation 10/01/2020
D 119 Project/Contract Administration
E 132 Upper Grande Ronde Bowman off site water Development Completion Report
F 185 Quarterly Status Reports